Skip to content

Upload and bundle behavior

A supportable explanation of what happens after an Agent ZIP reaches S4Ready Web.

Agent and SAP access

Use this when a user asks whether an upload is stuck, cancelled, too large, or safe to rerun.

Understand upload phases

The overlay names the major server-side steps.

  • Uploading transfers the ZIP bytes to the backend.
  • Creating web datasets creates one dataset per detected migration domain.
  • Confirming dataset creation verifies ingestion after a lost response or reconnect.

Handle bundle limits

The standard customer-managed license has no commercial bundle-size cap; host-safety and evaluation controls remain separate.

  • LICENSED does not cap bundle size. Plan limit reached applies only to an explicitly capped non-standard profile, not the normal customer-managed license.
  • A host-safety guard protects the installation; Web reports Bundle too large to process. The instance operator, not a workspace user, owns its sizing.
  • Split extraction by migration object when a bundle is too large to process.

Recover from partial work

Partial ingestion should be visible and explainable.

  • A cancelled ingestion keeps datasets committed before the safe checkpoint.
  • A run with failed tables can still upload when early review is useful.
  • Recognized S/4HANA config tables become stage-scoped reference-data snapshots.

How to use this page

Each guide is a compact operating view. Use it to act, then continue into the related workflow page when you need the next step.

  1. 1ScanRead the section headings and confirm you are in the right guide for the role or moment.
  2. 2ActUse the bullets as the checklist for the extraction, review, approval, or handoff task.
  3. 3ContinueJump to a related guide when the work moves into upload, mapping, governance, or security.

Related guides

Use these when the workflow moves to the next handoff point.